Daltons Gold Project

The Daltons Project licence (E45/4681) comprises a single exploration licence of 3 blocks, equalling about 9km2, which was granted on the 13 July 2017, for a period of five years. The licence contains a line of old workings spaced over a length of about 2km, variously named Daltons, McLeods Reward, Thomas and Eclipse. The lease is remote and best accessed by driving 72km south on the Marble Bar-Hillside road (unsealed), crossing the Shaw River, and then driving 17km by weak tracks into the lease area – the 89km drive takes about 2 ½ hours and the last 17km of track driving is difficult. The long access time dictates that work in this area requires camping on site.