Marble Bar North Gold Project

The Marble Bar North Project licence (P45/3040) comprises a single prospecting licence of 3.025 hectares, which was granted on the 2 July 2018, for a period of four years. The lease is 3km from Marble Bar Township, with a well maintained track running right to the old Ironclad mine-site and battery, a five minute drive from Marble Bar.