Marble Bar South Gold Project

The Marble Bar South Project licence (P45/3039) comprises a single prospecting licence of 8.26 hectares, which was granted on the 2 July 2018, for a period of four years. The lease is 11km south of Marble Bar Township, on the main Marble Bar-Hillside Road, and has a weak old track running through the lease, a fifteen minute drive from Marble Bar.